CISA primary OT mitigations
CISA, FBI, EPA, and DOE published five primary mitigations on 2025-05-06, including removing internet connections and changing default passwords.

Site network inventory
On-site walks record every network device to produce a clear drawing of plant connections and traffic paths.

Physical network discovery
Cellular modems installed by operators, vendors or integrators may be undocumented and missed by routine scans according to CISA alerts, so they are found by walking the site. On-site walks record every controller, HMI, drive, camera, switch and modem for a complete inventory.
Every controller, HMI, drive, camera, switch and modem is recorded at its location on the plant floor.
Deliverables include documentation showing what is connected, where devices sit, and how each zone reaches other parts of the facility.
Reports prioritize internet and modem exposures first to address immediate risks identified by CISA advisories.
Inspections cover everything from the plant floor to the office bridge. Results provide the inventory and map required by public frameworks.
Select a category
Walk records
Report shows
Reports detail the network drawing, device list, remote-access routes, and ranked findings plant teams use to plan maintenance and security work.
View section details
Sample layout shows report sections for a typical facility rather than a specific site.
Facilities along the coast use these assessments to secure production and meet regulatory requirements.
Site note
Facility needs
Walks produce the inventory and map these documents ask for.
CISA, FBI, EPA, and DOE published five primary mitigations on 2025-05-06, including removing internet connections and changing default passwords.
Guidance published 2025-08-13 asks owners to build and maintain a comprehensive OT asset inventory.
Security guide for operational technology provides a framework for protecting industrial control systems.
Rule 33 CFR 101.650(b) took effect 2025-07-16 and requires MTSA facilities to keep network maps and system inventories before the 2027-07-16 deadline.
Assessment supplies network facts for plans. CloudCentric does not write plans or certify compliance.
Managed switch consoles provide a live topology map and client list. History views show how the network looked at earlier times to keep the drawing current.

Assessments make no change to any PLC program.
Assessments provide no certification and no written Cybersecurity Plan.
Equipment lacks IEC 62443 certification although designs can follow zones and conduits.
Consultants walk the plant floor to record every controller, HMI, drive, and switch inside panels and MCC rooms.
Physical walks record hardware and assessments change no PLC program. Separation work follows later, zone by zone, during planned downtime.
Reports include a network drawing, a full device inventory, a list of remote-access routes, and ranked findings.
Assessments provide the inventory of network-connected systems and the network map required by 33 CFR 101.650(b).
Physical walks find undocumented cellular modems installed by vendors or operators that automated scans often fail to detect.