Modems replaced with VPN
Unmanaged cellular modems on PLCs give way to logged VPN access through a central firewall.

Utility network engineering
Plant and office networks separated, vendor modems replaced with logged VPN access, and lift stations linked for utilities from Charleston to Savannah.

SCADA network control
Network work focuses on switches and firewalls around your control systems. CloudCentric engineers work alongside your SCADA integrator to secure remote access and separate automation traffic.
Controllers sit on private VLANs, isolated from office workstations by a firewall controlling every connection path.
Cellular modems and port-forwards give way to logged VPN access through a central gateway, mapped to specific vendors.
Pump stations connect back to the main plant using a managed industrial router or long-range wireless bridge.
Operations managers and integrators need exact records of every connected device.
Typical setup requests
System requirements
Isolate controllers and HMIs from general traffic. Firewall rules drop unauthorized connections between zones, logging every vendor connection and securing plant operations from internet exposure.
Names and layout shown are an example.
Addresses and ports define exact communication paths between plant and office areas. Connections crossing zones are logged at the gateway, giving operators a record of every remote vendor login.

Community water systems must assess automated and computer systems alongside physical infrastructure. Network maps and asset lists from CloudCentric feed the computer-systems section. Systems review their assessment every five years and certify completion directly to EPA.
System population size
Dates follow EPA published schedules. Utilities certify directly to EPA.
OT network assessment
Engineers walk your site to record HMIs, drives, and modems on the network. PLC programs remain untouched while unmanaged switches and default passwords are listed for replacement.
Engineers trace connections physically, identifying every switch, controller, and camera on the plant network.
Scans locate port-forwards, active internet paths, undocumented modems, and shared logins left behind by past jobs.
Detailed asset lists and topology drawings document current architecture, feeding directly into your risk assessment paperwork.
Re-addressing and separation tasks are scheduled in sections, coordinating with your integrator to keep production running.

Work replaces flat topologies with secure zones, providing visibility into remote pump stations and logging all vendor access.
Unmanaged cellular modems on PLCs give way to logged VPN access through a central firewall.
Controllers, HMIs, and engineering workstations run on dedicated VLANs isolated from general staff internet traffic.
DIN-rail switches report port status and alarms, replacing silent unmanaged switches inside cabinets.
Industrial routers link remote sites back to the firewall, giving central visibility over pump networks.
Long-range wireless links connect outbuildings and pumps without trenching new cable.
Offline, tested backups of Allen-Bradley and Siemens controller programs are stored safely before any network changes.
Integrators use individual VPN profiles mapped only to specific PLCs they support.
Optical zoom and infrared cameras monitor yards, running on an isolated VLAN with footage recorded locally.
Badge readers log entry to the room holding your OT hardware, running on the central network console.
Complete documentation of connected devices supports EPA assessment reporting and emergency response planning.
Engineers coordinate IP address changes and network routing directly with your controls engineers or integrator, ensuring HMI and peer connections stay active.
CloudCentric delivers the network map and connected-asset list that feed the computer-systems section of your assessment. Utilities write their emergency response plan and certify completion to EPA.
Direct cellular modems are disconnected after configuring secure VPN access through the firewall. Outside vendors then connect using mapped, individual accounts that log their activity.
Separation tasks happen zone by zone during planned downtime. Equipment continues processing water while network routes update.
Controller logic and process code remain completely untouched. Work focuses entirely on the network paths, switches, and firewalls around the PLCs.
Engineers serve water and wastewater utilities along the coast, covering Charleston, Mount Pleasant, North Charleston, Summerville, Beaufort, Bluffton, Hilton Head, and Savannah.
Call (844) 422-7000 or book a walkthrough to map your connected assets and replace undocumented modems with logged VPN access.