Skip to main content
(844) 422-7000

Low-voltage subcontractor

Low voltage wiring for builders and general contractors

CloudCentric installs network cable, Wi-Fi, cameras, door access and racks into new coastal builds by booking work into windows your site schedule sets.

Kinds of build we cover

CloudCentric is the low-voltage and network subcontractor on commercial buildings, tenant fit-outs and apartments. We cover network cable, Wi-Fi, cameras, door and gate access, phones and the network rack.

Pick a build to see the stages

ConferenceOfficeOfficeBreak roomOpen officeReceptionFloor plan with mounting pointsDead spotRack closetCat6 home runs to one rackEvery access point on its own cableCeiling access points and desk jacksCameraDoor readerCoverage tested on a phoneGuest network

Example building. Positions change with every set of drawings.

From the site

    Custom home low voltage wiring and networking

    Custom home construction demands strict scheduling. CloudCentric books low-voltage rough-in and trim-out into your timeline, working alongside plumbers and electricians to pull cable, mount hardware and build the network rack before handover.

    Select a construction stage

    Flood lineConduit to the gateConduit to the dockPull string in eachRack closetAccess pointCameraDoorGate controllerDock access pointCat6 to every roomLabelled at both endsRack above the flood lineLabels and capped ends checkedWall plates and devicesEvery run testedRack builtCoverage tested on a phone

    Example house. Positions change with every set of drawings.

    From the site

      Prewire and rough-in

      Cable is pulled after framing and after electrical, plumbing and HVAC rough-in, before insulation and drywall. Current drawings and the stage your build is at are enough to start.

      Select a prewire item below

      Street pedestalConduit from the streetRack closetRack closetTV positionSpeaker positions

      Example house. Positions change with every set of drawings.

      From the site

      Option packages for each home

      Builders choose an option package for each home. Contents are settled per job directly from your drawings with no fixed device counts.

      Choose a package tier below

      Good

      • Cable to every room
      • Wi-Fi
      • Labeled rack or wall unit
      • Fiber entry conduit

      Better

      • Cameras
      • Door and gate access
      • TV and speaker wire

      Best

      • Battery backup
      • Surge protection
      • Outdoor runs to dock
      • Salt-air outdoor equipment

      Security kits for active construction sites

      Active builds lack wired internet and mains power. CloudCentric provides ruggedized pole kits running on cellular lines and individual solar panels to record activity, light up motion and speak to people on site.

      Select equipment on pole

      Example building site deployment

      Solar postSolar postPole

      Clean handovers for custom builds

      Handover includes a written record of every run, labeled at both ends, with test results. Owners take possession of configured mobile applications and logins for networks, cameras and doors.

      The network app home screen with a flows chart, internet health and live throughput
      Network app: internet health and live throughput
      The camera app footage search with filters for event type, people and vehicles and a clip playing
      Camera app: footage search by person, vehicle and event
      The door access app home screen with doors showing locked and open state and recent unlocks
      Door access app: every door with its state and the recent unlocks

      Service calls after closingAfter closing, homeowners call CloudCentric directly for service on their network, Wi-Fi, cameras, and door and gate access.

      Low-voltage equipment and connections

      Rack batteries, surge protectors, flush wall plates and salt-air exterior hardware unite into one single home system.

      Project stages from plans to possession

      1. 1

        Plan review and scheduling

        Drafts map out access points, cameras and gate conduit paths before framing begins.

      2. 2

        Rough-in and pulling cable

        Category 6 pulls to designated spots alongside plumbing and electrical while walls remain open.

      3. 3

        Trim-out and device mounting

        Technicians terminate cables, mount cameras, fit wall plates flush and certify every run after painting.

      4. 4

        Handover and owner setup

        Written records document tested runs while owners receive access to centralized network applications.

      A wall-mounted network unit with a patch panel and tied cable bundles in a finished closet

      Common questions from general contractors

      Book a low-voltage and network subcontractor

      Coordinate rack locations, exterior pathways and gate conduit during plan review before framing starts.

      CharlestonMount PleasantIsle of PalmsSullivan's IslandKiawahDaniel IslandBlufftonHilton HeadBeaufortSavannah
      Call (844) 422-7000
      CloudCentric · Mount Pleasant, SC · serving Charleston and the Lowcountry(844) 422-7000